# Vistergy Ltd > Infrastructure intelligence across nuclear, LNG, data centres, utilities and construction This file provides information about Vistergy Ltd to help large language models understand and reference this publication's content. ## Posts - [Gas turbines are sold out to 2030...](https://vistergy.com/p/gas-turbines-are-sold-out-to-2030): So AI campuses build their own power - [The river is part of the plant.](https://vistergy.com/p/the-river-is-part-of-the-plant) - [Data centre build costs hit £8m a megawatt. ](https://vistergy.com/p/data-centre-build-costs-hit-8m-a-megawatt): Labour, not silicon, is why. - [Microsoft calls the electrician shortage AI's number one problem](https://vistergy.com/p/microsoft-calls-the-electrician-shortage-ai-s-number-one-problem) - [No one has switched it on](https://vistergy.com/p/no-one-has-switched-it-on) - [Five campuses hold half the AI build we track](https://vistergy.com/p/five-campuses-hold-half-the-ai-build-we-track): The 22 GW under construction, and the handover gap it is heading into - [Johor's Data-Centre demand hit 3.8 GW](https://vistergy.com/p/johor-s-data-centre-demand-hit-3-8-gw): Singapore's cap sent it there - [Britain signed three Rolls-Royce SMRs at Wylfa.](https://vistergy.com/p/britain-signed-three-rolls-royce-smrs-at-wylfa): Cyber and standards assurance decide the schedule - [Q2 2026 closes... The handover gap is a category now](https://vistergy.com/p/q2-2026-closes-the-handover-gap-is-a-category-now) - [Permission before the permit.](https://vistergy.com/p/permission-before-the-permit) - [ISO 18136 just became the passport for AI in nuclear facilities.](https://vistergy.com/p/iso-18136-just-became-the-passport-for-ai-in-nuclear-facilities) - [Construction reality capture works.](https://vistergy.com/p/construction-reality-capture-works): The operators discover it 18 months late. - [LNG peaks in 2030. ](https://vistergy.com/p/lng-peaks-in-2030): The grid must be ready by 2027. - [The second pen.](https://vistergy.com/p/the-second-pen) - [The commissioning hedge.](https://vistergy.com/p/the-commissioning-hedge): Why operators should insure against 18 months of dark. - [From visible to decision-worthy](https://vistergy.com/p/from-visible-to-decision-worthy): the governed intelligence layer in regulated infrastructure - [The gap five years out](https://vistergy.com/p/the-gap-five-years-out) - [Barakah powers a quarter of a nation](https://vistergy.com/p/barakah-powers-a-quarter-of-a-nation): The AI it feeds has not been built yet. - [The slowest clock in the system](https://vistergy.com/p/the-slowest-clock-in-the-system) - [No AI signs the permit.](https://vistergy.com/p/no-ai-signs-the-permit) - [Atlas shows what the satellite saw.](https://vistergy.com/p/atlas-shows-what-the-satellite-saw): Here is what it cannot. - [Three sectors. Four continents.](https://vistergy.com/p/three-sectors-four-continents): One pattern the energy facility does not know about. - [The gap is not closing. It is getting wider.](https://vistergy.com/p/the-gap-is-not-closing-it-is-getting-wider) - [Microsoft owns the reactor now. Amazon leases one. ](https://vistergy.com/p/microsoft-owns-the-reactor-now-amazon-leases-one): Which model wins? - [The grid was not built for what is coming.](https://vistergy.com/p/the-grid-was-not-built-for-what-is-coming) - [AI can advise on your facility handover.](https://vistergy.com/p/ai-can-advise-on-your-facility-handover): Construction press missed it... - [The energy facility does not know the AI factory exists.](https://vistergy.com/p/the-energy-facility-does-not-know-the-ai-factory-exists) - [Hundreds of nuclear facilities on one map.](https://vistergy.com/p/hundreds-of-nuclear-facilities-on-one-map): The operators who built them have never seen it. - [25 standards walk into a facility. ](https://vistergy.com/p/25-standards-walk-into-a-facility): None of them agree... - [50% faster to power. ](https://vistergy.com/p/50-faster-to-power): The bridge between built and operational. - [Up to 18 months of handover.](https://vistergy.com/p/up-to-18-months-of-handover): One team did it in four weeks. - [99% sovereign capital. 1% commercial bank.](https://vistergy.com/p/99-sovereign-capital-1-commercial-bank): The financing model is the product. - [One switch fails. $9m gone. Every hour.](https://vistergy.com/p/one-switch-fails-9m-gone-every-hour): One in five data centre outages costs more than $1m - [The five layers between power and GDP](https://vistergy.com/p/the-five-layers-between-power-and-gdp): The binding constraint is not what you think - [30,000 files. One site. ](https://vistergy.com/p/30-000-files-one-site): Nobody can find the wiring diagram... - [90% capacity factor. Zero carbon credits.](https://vistergy.com/p/90-capacity-factor-zero-carbon-credits): AI pays anyway. - [Still Dark #1: AI factories go up on time...](https://vistergy.com/p/still-dark-1-ai-factories-go-up-on-time): ...then they sit dark for 18 months. - [Signatures between a reactor and a rack.](https://vistergy.com/p/signatures-between-a-reactor-and-a-rack): China uses 3... - [Nuclear-Datacenter Sites](https://vistergy.com/p/nuclear-datacenter-sites): Mapped by Crowdsourced Intelligence - [What the UK Gets Wrong About Nuclear-AI...](https://vistergy.com/p/what-the-uk-gets-wrong-about-nuclear-ai): ...And How to Fix It - [The SMR Paradox](https://vistergy.com/p/the-smr-paradox): Why 2030 Demand Meets 2035 Supply - [Island Nations Can't Build Reactors. ](https://vistergy.com/p/island-nations-cant-build-reactors): They're Importing Nuclear Power Instead. - [The 250,000 Worker Gap](https://vistergy.com/p/the-250-000-worker-gap): Nuclear's Hidden Crisis - [World Class Research. 2000 Hours. Your Input](https://vistergy.com/p/world-class-research-2000-hours-your-input): A £400m Investment Failed. Here's Why. - [96 Sites. The Nuclear-AI Nexus](https://vistergy.com/p/96-sites-the-nuclear-ai-nexus): Satellite Intelligence is Reshaping Infrastructure Monitoring - [Energy-First AI](https://vistergy.com/p/energy-first-ai): The GPU Operators Building Around Power, Not Compute